HEMS UPDATE AS OF June 22, 2012
* 25 % OF FOOTERS HAVE BEEN POURED
* THE GYMNASIUM SLABS AND CURVED CORRIDOR HAVE BEEN P0URED
* SAMPLE POLISHED FLOOR SLAB WITH COLOR HAS BEEN COMPLETED (NOTE THE COLORS IN THE PICTURE) MORE COLORS ARE TO COME
* THE FLOOR GRINDING AND POLISHING IS BEING DEMONSTRATED AND MONITORED BY ZMM CONSULTANT
* STRUCTURAL STEEL HAS BEEN STARTED IN THE CORNER OF THE GYMNASIUM
* BOND BEAMS ARE BEING POURED IN THE WALLS FOR STRENGTH
* THE EASTERN WING OF CLASSROOM FLOORS ARE BEING READIED FOR SLAB POURS THAT SHOULD TAKE PLACE IN ABOOUT TEN DAYS
* THE PROJECT STUDY FOR THE STOP LIGHT ON RT. 60 DID NOT QUALIFY FOR A LIGHT
* NORWAY PROPERTY (HOUSE) HAS BEEN PURCHASED AND BEEN CLEARED (AREA WHERE SIGN IS)
* COMPLETING FOOTERS IN AREA C
* COORIDOR WALS ARE GOING UP
* ELECTRICAL CONDUIT HAS BEEN INSTALLED FOR MAIN DISTRIBUTION PANEL
* WALL BRACES HAVE BEEN INSTALLED ON INTERIOR WALLS AS PEER OSHA STANDARDS (SEE PICTURE)
* PROJECT IS CURRENTLY ON SCHEDULE
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |